GoTek Energy’s® DynaKinetic™ engine, compressor, pump, and gas motor product designs and common manufacturing process have been engineered from day one with quality in mind.

Product design failure mode and effect analysis (DFMEA) was conducted early.  Product designs also incorporated design for manufacturability (DFM) and design for assembly (DFA) as well as design error proofing.

Manufacturing process failure mode and effect analysis (PFMEA) was also conducted early as the product design was occurring. Manufacturing processes also incorporate process error proofing (poka-yokes) as well as complete process controls coupled with statistical monitoring and control limits.  Redundant multi-operation process error proofing was employed wherever possible.  Good and bad part masters are run each shift to confirm process check functionality.  All in-process rejections are contained with lock-box approaches.  Scrap PPM monitoring occurs with daily analysis and 5-phase corrective action plans.

Customer quality return PPM monitoring also occurs with 5-phase corrective action plans.

GoTek Energy® also has personnel who are Shainin LLC certified in Statistical Engineering, as a Red-X Apprentice, and as a Rolling Top 5 Manager.

Shainin Logo

Finally, GoTek Energy® will be TS-16949 certified.